Configure your system

800 W
7.6 m (25 ft)
65%
Source outlets
Hardwired consumer unit (RCBO protected)
Load connection
Hardwired via DP isolator · IEC 60309 32A
Verified Hardware Match

Check current bundle pricing for the Fox ESS EP5 Modular Hybrid plus a changeover switch kit for this setup.

As an Amazon Associate, we earn from qualifying purchases.

Verified Compatible

Fox ESS EP5 Modular Hybrid handles 2,400 W continuous and 4,600 W surge with headroom.

2,600 W of continuous capacity left for other circuits.

Continuous load
48%
Runtime (no sun)
2.8 hrs
65% duty · 85% inverter eff.
Solar recharge
8.1 hrs
1.8 sun-days at 800 W
Min. copper wire
1.5 mm²
0.8% drop @ 7.6 m
Overcurrent device
13A MCB
10.4A load × 1.00 = 10.4A
Live schematic & breaker sizing diagram 230V AC • IEC 60364
SOLAR PV INPUT 800 W PV MC4 / XT60 · MPPT POWER SOURCE / INVERTER Fox ESS EP5 Modular Hybrid 5,180 Wh • 5,000 W 7,500 W surge • 120/240V 48% load 13A MCB 1.5 mm² Cu 10.4A @ 230V CONNECTED LOAD 3-Ton Central Heat Pump (With Soft-Start… 2,400 W running 4,600 W surge 230V load

Engineering report · reviewed against NEC 2026 & BS 7671:2018+A2

Engineering Breakdown: Running a 3-Ton Central Heat Pump (With Soft-Start Module) on the Fox ESS EP5 Modular Hybrid

UK/EU/AU: Verified Compatible 48% inverter utilization Sold in UK / EU / AU only

When pairing the Fox ESS EP5 Modular Hybrid (5,180 Wh LiFePO4 capacity, 5,000 W continuous, 7,500 W surge) with a 3-Ton Central Heat Pump (With Soft-Start Module) (2,400 W running, 4,600 W starting surge), the system operates at 48% of continuous inverter capacity on a 230 V UK/EU/AU circuit. At a 100% duty cycle and 85% inverter efficiency, a full battery delivers roughly 1.8 hrs of off-grid runtime. Wiring the connection over a 7.5 m run calls for a 13 A MCB and 1.5 mm² copper, terminated at a Hardwired via DP isolator · IEC 60309 32A connection.

1. Compatibility Verdict & Inverter Load Utilization

In UK/EU/AU 230 V mode the 3-Ton Central Heat Pump (With Soft-Start Module) loads the Fox ESS EP5 Modular Hybrid's inverter to 48% of its 5,000 W continuous rating and 61% of its 7,500 W surge rating. Both figures are under the 80% sustained-load guideline, so this is a comfortable, verified match with 2,600 W of spare capacity for lights, a router or a refrigerator on the same unit.

CheckLoad requiresFox ESS EP5 Modular Hybrid providesUK/EU/AU
Continuous output 2,400 W 5,000 W Pass
Start-up surge 4,600 W 7,500 W Pass
Voltage 230 V 230 V Pass
Connection Hardwired via DP isolator · IEC 60309 32A Hardwired consumer unit (RCBO protected)

Compressor-driven HVAC equipment is the hardest category for any inverter because of locked-rotor amperage (LRA): for a fraction of a second the motor pulls 1.9× its running power (4,600 W here). The Fox ESS EP5 Modular Hybrid is rated for 7,500 W of surge, which covers that inrush. Thermostat cycling means the compressor rarely runs 100% of the time; mild weather typically produces 30–50% duty cycles, while peak summer afternoons push toward 80–100%. Fitting a soft-start module (Micro-Air EasyStart, SoftStartRV or a variable-speed inverter compressor) is the single cheapest way to make a marginal pairing reliable.

The Fox ESS EP5 Modular Hybrid combines a hybrid solar inverter with stackable battery modules, wired permanently into the home's distribution board. Its 6,500 W PV input lets one unit handle both rooftop solar and storage.

2. Real-World Runtime by Duty Cycle

Nameplate capacity is not usable capacity. DC-to-AC conversion, battery management overhead and cell protection reduce the 5,180 Wh rating to about 4,403 Wh of deliverable AC energy (85% system efficiency). Duty cycle is the share of each hour the load actually draws its running power — thermostats, pressure switches and intermittent use all lower it.

Runtime (h) = (5,180 Wh × 0.85) ÷ (2,400 W × duty cycle)
Duty cycleAverage drawRuntime (no solar)Energy per 24 h
25% 600 W 7.3 hrs 14.4 kWh
50% 1,200 W 3.7 hrs 28.8 kWh
65% 1,560 W 2.8 hrs 37.4 kWh
100% 2,400 W 1.8 hrs 57.6 kWh

Even at a 50% duty cycle the battery lasts 3.7 hrs, so plan on solar, grid or generator recharging for anything longer than an evening outage.

3. BS 7671 / IEC 60364 Breaker & Cable Sizing

IEC-based codes size protection by design current rather than a blanket 125% multiplier: Ib ≤ In ≤ Iz. At 230 V the load draws 10.4 A, so a 13 A Type B/C MCB with RCD protection applies. In the UK, BS 7671 Section 722 additionally requires a dedicated circuit and Type A or Type B RCD for EV charge points.

One-way distanceMCBMin. cableVoltage drop
7.5 m (25 ft) 13 A 1.5 mm² 0.82%
15 m (49 ft) 13 A 1.5 mm² 1.65%
22.5 m (74 ft) 13 A 1.5 mm² 2.47%
30 m (98 ft) 13 A 2.5 mm² 2.02%

Moving the Fox ESS EP5 Modular Hybrid from 7.5 m to 30 m away forces the conductor up from 1.5 mm² to 2.5 mm² — park the unit as close to the load as ventilation and weather protection allow.

4. Solar Array Recharge Time Breakdown

The Fox ESS EP5 Modular Hybrid accepts up to 6,500 W of photovoltaic input. Real arrays rarely deliver nameplate output, so we apply an 80% harvest factor for MPPT conversion, cell temperature and soiling, and convert hours to days using 4.5 peak-sun-hours — a conservative annual average for the US, southern Europe and Australia (UK winters can fall below 1.5).

PV arrayReal harvest0–100% rechargeSun-days @ 4.5 PSHNet with load @ 50%
800 W 640 W 8.1 hrs 1.8 −560 W
1,600 W 1,280 W 4.0 hrs 0.9 +80 W
3,000 W 2,400 W 2.2 hrs 0.5 +1,200 W
6,000 W 4,800 W 1.1 hrs 0.2 +3,600 W
6,500 W 5,200 W 60 min 0.2 +4,000 W

A typical 800 W portable array refills the battery in about 8.1 hrs of strong sun, while maxing out the 6,500 W input cuts that to 60 min. To fully offset the 3-Ton Central Heat Pump (With Soft-Start Module) at a 50% duty cycle (1,200 W average) during daylight you need roughly 1,500 W of panels, which this unit can accept.

5. Frequently Asked Questions

Can the Fox ESS EP5 Modular Hybrid run a 3-Ton Central Heat Pump (With Soft-Start Module)?

Yes. The Fox ESS EP5 Modular Hybrid delivers 5,000 W continuous and 7,500 W surge, covering the 3-Ton Central Heat Pump (With Soft-Start Module)'s 2,400 W running and 4,600 W start-up draw at 48% inverter utilization.

How long will the Fox ESS EP5 Modular Hybrid run a 3-Ton Central Heat Pump (With Soft-Start Module)?

With 5,180 Wh of capacity and 85% inverter efficiency, expect about 1.8 hrs of continuous operation and 3.7 hrs at a 50% duty cycle. Adding solar input during the day extends this further.

What breaker and wire size do I need to connect a 3-Ton Central Heat Pump (With Soft-Start Module) to the Fox ESS EP5 Modular Hybrid?

At 230 V the load draws 10.4 A. Under BS 7671 / IEC 60364 the protective device must be at least the design current (Ib ≤ In ≤ Iz), so use a 13 A MCB with RCD protection on 1.5 mm² copper cable for runs up to 7.5 m (0.8% voltage drop). Connection: Hardwired via DP isolator · IEC 60309 32A.

How long does it take to recharge the Fox ESS EP5 Modular Hybrid with solar panels?

With an 800 W array and an 80% real-world harvest factor, a full recharge takes about 8.1 hrs of peak sun (1.8 days at 4.5 peak-sun-hours). At its maximum 6,500 W solar input it drops to 60 min.

Methodology & safety note

Specifications come from manufacturer datasheets in our open dataset; ampacity and resistance values follow NEC Table 310.16 and Chapter 9 Table 8, and BS 7671 Appendix 4. Calculations assume copper conductors, 30 °C ambient and no bundling derating. Inverter-to-panel connections require a listed transfer switch or interlock to prevent back-feeding the grid. These results are an engineering estimate, not a substitute for a licensed electrician and local permit. See our methodology and safety disclaimer.

Status dots show the UK/EU/AU verdict: compatible, conditional, not compatible.

Other loads on the Fox ESS EP5 Modular Hybrid

All 50 loads on the Fox ESS EP5 Modular Hybrid →

Other power stations for the 3-Ton Central Heat Pump (With Soft-Start Module)

Compare every source for this load →

More HVAC & Climate Control on the Fox ESS EP5 Modular Hybrid