Configure your system

800 W
7.6 m (25 ft)
30%
Source outlets
Hardwired consumer unit (RCBO protected)
Load connection
Hardwired via DP isolator · IEC 60309 32A
Verified Hardware Match

Works today. For more headroom, the Anker SOLIX F3800 runs it at 75% load.

As an Amazon Associate, we earn from qualifying purchases.

Compatible · High Load

Runs the load, but at 90% of continuous capacity.

Above the 80% sustained-load guideline — expect fan noise, heat and reduced headroom for other loads.

Continuous load
90%
Runtime (no sun)
3.2 hrs
30% duty · 85% inverter eff.
Solar recharge
8.0 hrs
1.8 sun-days at 800 W
Min. copper wire
2.5 mm²
1.0% drop @ 7.6 m
Overcurrent device
20A MCB
19.6A load × 1.00 = 19.6A
Live schematic & breaker sizing diagram 230V AC • IEC 60364
SOLAR PV INPUT 800 W PV MC4 / XT60 · MPPT POWER SOURCE / INVERTER myenergi Libbi (5kW Inverter + 5kWh Battery) 5,120 Wh • 5,000 W 7,500 W surge • 120/240V 90% load 20A MCB 2.5 mm² Cu 19.6A @ 230V CONNECTED LOAD Standard 40-Gal Electric Tank Water H… 4,500 W running 4,500 W surge 230V load

Engineering report · reviewed against NEC 2026 & BS 7671:2018+A2

Engineering Breakdown: Running a Standard 40-Gal Electric Tank Water Heater on the myenergi Libbi (5kW Inverter + 5kWh Battery)

UK/EU/AU: Compatible · High Load 90% inverter utilization Sold in UK / EU / AU only

When pairing the myenergi Libbi (5kW Inverter + 5kWh Battery) (5,120 Wh LiFePO4 capacity, 5,000 W continuous, 7,500 W surge) with a Standard 40-Gal Electric Tank Water Heater (4,500 W running, 4,500 W starting surge), the system operates at 90% of continuous inverter capacity on a 230 V UK/EU/AU circuit. At a 100% duty cycle and 85% inverter efficiency, a full battery delivers roughly 58 min of off-grid runtime. Wiring the connection over a 7.5 m run calls for a 20 A MCB and 2.5 mm² copper, terminated at a Hardwired via DP isolator · IEC 60309 32A connection.

1. Compatibility Verdict & Inverter Load Utilization

In UK/EU/AU 230 V mode the Standard 40-Gal Electric Tank Water Heater loads the myenergi Libbi (5kW Inverter + 5kWh Battery)'s inverter to 90% of its 5,000 W continuous rating and 60% of its 7,500 W surge rating. The pairing works, but running above 80% for hours raises internal temperatures and fan noise, and leaves little room for other loads. Treat it as a dedicated circuit.

CheckLoad requiresmyenergi Libbi providesUK/EU/AU
Continuous output 4,500 W 5,000 W Pass
Start-up surge 4,500 W 7,500 W Pass
Voltage 230 V 230 V Pass
Connection Hardwired via DP isolator · IEC 60309 32A Hardwired consumer unit (RCBO protected)

Pumps are short-cycling, high-inrush loads. A well or sump pump might run for only 1–3 minutes at a time, but every start pulls 4,500 W — 1.0× its 4,500 W running draw — as the motor accelerates a column of water. That is why a pump that "only uses 4,500 W" still trips undersized inverters. Deep-well submersibles in North America are almost always 240 V two-wire or three-wire motors, so a 120 V-only station cannot drive them without a step-up transformer. A larger pressure tank reduces the number of starts per hour and is a worthwhile upgrade for off-grid systems built around the myenergi Libbi (5kW Inverter + 5kWh Battery).

The myenergi Libbi (5kW Inverter + 5kWh Battery) is a UK smart home storage system, installed on a dedicated circuit from the consumer unit under BS 7671 and typically paired with a time-of-use tariff to charge overnight and discharge at peak. Backup operation for specific circuits depends on the installer fitting an EPS/backup switch.

2. Real-World Runtime by Duty Cycle

Nameplate capacity is not usable capacity. DC-to-AC conversion, battery management overhead and cell protection reduce the 5,120 Wh rating to about 4,352 Wh of deliverable AC energy (85% system efficiency). Duty cycle is the share of each hour the load actually draws its running power — thermostats, pressure switches and intermittent use all lower it.

Runtime (h) = (5,120 Wh × 0.85) ÷ (4,500 W × duty cycle)
Duty cycleAverage drawRuntime (no solar)Energy per 24 h
25% 1,125 W 3.9 hrs 27.0 kWh
50% 2,250 W 1.9 hrs 54.0 kWh
65% 2,925 W 1.5 hrs 70.2 kWh
100% 4,500 W 58 min 108.0 kWh

Even at a 50% duty cycle the battery lasts 1.9 hrs, so plan on solar, grid or generator recharging for anything longer than an evening outage.

3. BS 7671 / IEC 60364 Breaker & Cable Sizing

IEC-based codes size protection by design current rather than a blanket 125% multiplier: Ib ≤ In ≤ Iz. At 230 V the load draws 19.6 A, so a 20 A Type B/C MCB with RCD protection applies. In the UK, BS 7671 Section 722 additionally requires a dedicated circuit and Type A or Type B RCD for EV charge points.

One-way distanceMCBMin. cableVoltage drop
7.5 m (25 ft) 20 A 2.5 mm² 0.95%
15 m (49 ft) 20 A 2.5 mm² 1.89%
22.5 m (74 ft) 20 A 2.5 mm² 2.84%
30 m (98 ft) 20 A 4.0 mm² 2.35%

Moving the myenergi Libbi (5kW Inverter + 5kWh Battery) from 7.5 m to 30 m away forces the conductor up from 2.5 mm² to 4.0 mm² — park the unit as close to the load as ventilation and weather protection allow.

4. Solar Array Recharge Time Breakdown

The myenergi Libbi (5kW Inverter + 5kWh Battery) accepts up to 5,000 W of photovoltaic input. Real arrays rarely deliver nameplate output, so we apply an 80% harvest factor for MPPT conversion, cell temperature and soiling, and convert hours to days using 4.5 peak-sun-hours — a conservative annual average for the US, southern Europe and Australia (UK winters can fall below 1.5).

PV arrayReal harvest0–100% rechargeSun-days @ 4.5 PSHNet with load @ 50%
400 W 320 W 16.0 hrs 3.6 −1,930 W
800 W 640 W 8.0 hrs 1.8 −1,610 W
1,600 W 1,280 W 4.0 hrs 0.9 −970 W
3,000 W 2,400 W 2.1 hrs 0.5 +150 W
5,000 W 4,000 W 1.3 hrs 0.3 +1,750 W

A typical 800 W portable array refills the battery in about 8.0 hrs of strong sun, while maxing out the 5,000 W input cuts that to 1.3 hrs. To fully offset the Standard 40-Gal Electric Tank Water Heater at a 50% duty cycle (2,250 W average) during daylight you need roughly 2,850 W of panels, which this unit can accept.

5. Frequently Asked Questions

Can the myenergi Libbi (5kW Inverter + 5kWh Battery) run a Standard 40-Gal Electric Tank Water Heater?

Yes. The myenergi Libbi (5kW Inverter + 5kWh Battery) delivers 5,000 W continuous and 7,500 W surge, covering the Standard 40-Gal Electric Tank Water Heater's 4,500 W running and 4,500 W start-up draw at 90% inverter utilization, which is above the 80% guideline, so dedicate the unit to this load.

How long will the myenergi Libbi (5kW Inverter + 5kWh Battery) run a Standard 40-Gal Electric Tank Water Heater?

With 5,120 Wh of capacity and 85% inverter efficiency, expect about 58 min of continuous operation and 1.9 hrs at a 50% duty cycle. Adding solar input during the day extends this further.

What breaker and wire size do I need to connect a Standard 40-Gal Electric Tank Water Heater to the myenergi Libbi (5kW Inverter + 5kWh Battery)?

At 230 V the load draws 19.6 A. Under BS 7671 / IEC 60364 the protective device must be at least the design current (Ib ≤ In ≤ Iz), so use a 20 A MCB with RCD protection on 2.5 mm² copper cable for runs up to 7.5 m (0.9% voltage drop). Connection: Hardwired via DP isolator · IEC 60309 32A.

How long does it take to recharge the myenergi Libbi (5kW Inverter + 5kWh Battery) with solar panels?

With an 800 W array and an 80% real-world harvest factor, a full recharge takes about 8.0 hrs of peak sun (1.8 days at 4.5 peak-sun-hours). At its maximum 5,000 W solar input it drops to 1.3 hrs.

Methodology & safety note

Specifications come from manufacturer datasheets in our open dataset; ampacity and resistance values follow NEC Table 310.16 and Chapter 9 Table 8, and BS 7671 Appendix 4. Calculations assume copper conductors, 30 °C ambient and no bundling derating. Inverter-to-panel connections require a listed transfer switch or interlock to prevent back-feeding the grid. These results are an engineering estimate, not a substitute for a licensed electrician and local permit. See our methodology and safety disclaimer.

Status dots show the UK/EU/AU verdict: compatible, conditional, not compatible.

Other loads on the myenergi Libbi (5kW Inverter + 5kWh Battery)

All 50 loads on the myenergi Libbi (5kW Inverter + 5kWh Battery) →

Other power stations for the Standard 40-Gal Electric Tank Water Heater

Compare every source for this load →

More Pumps & Water Systems on the myenergi Libbi (5kW Inverter + 5kWh Battery)