Engineering report · reviewed against NEC 2026 & BS 7671:2018+A2
Engineering Breakdown: Running a 3-Ton Central Air Conditioner (Standard LRA) on the Selectronic SP Pro AU Off-Grid Inverter
When pairing the Selectronic SP Pro AU Off-Grid Inverter (10,240 Wh LiFePO4 capacity, 7,500 W continuous, 22,500 W surge) with a 3-Ton Central Air Conditioner (Standard LRA) (3,200 W running, 9,500 W starting surge), the system operates at 43% of continuous inverter capacity on a 230 V UK/EU/AU circuit. At a 100% duty cycle and 85% inverter efficiency, a full battery delivers roughly 2.7 hrs of off-grid runtime. Wiring the connection over a 7.5 m run calls for a 16 A MCB and 1.5 mm² copper, terminated at a Hardwired via DP isolator · IEC 60309 32A connection.
1. Compatibility Verdict & Inverter Load Utilization
In UK/EU/AU 230 V mode the 3-Ton Central Air Conditioner (Standard LRA) loads the Selectronic SP Pro AU Off-Grid Inverter's inverter to 43% of its 7,500 W continuous rating and 42% of its 22,500 W surge rating. Both figures are under the 80% sustained-load guideline, so this is a comfortable, verified match with 4,300 W of spare capacity for lights, a router or a refrigerator on the same unit.
| Check | Load requires | Selectronic SP Pro AU Off-Grid Inverter provides | UK/EU/AU |
|---|---|---|---|
| Continuous output | 3,200 W | 7,500 W | Pass |
| Start-up surge | 9,500 W | 22,500 W | Pass |
| Voltage | 230 V | 230 V | Pass |
| Connection | Hardwired via DP isolator · IEC 60309 32A | Hardwired consumer unit (RCBO protected) |
Compressor-driven HVAC equipment is the hardest category for any inverter because of locked-rotor amperage (LRA): for a fraction of a second the motor pulls 3.0× its running power (9,500 W here). The Selectronic SP Pro AU Off-Grid Inverter is rated for 22,500 W of surge, which covers that inrush. Thermostat cycling means the compressor rarely runs 100% of the time; mild weather typically produces 30–50% duty cycles, while peak summer afternoons push toward 80–100%. Fitting a soft-start module (Micro-Air EasyStart, SoftStartRV or a variable-speed inverter compressor) is the single cheapest way to make a marginal pairing reliable.
The Selectronic SP Pro AU Off-Grid Inverter is a heavy-duty off-grid inverter-charger built for rural properties, with a surge rating of 22,500 W — 3.0× its continuous output — designed to start bore pumps, workshop compressors and other large motors.
2. Real-World Runtime by Duty Cycle
Nameplate capacity is not usable capacity. DC-to-AC conversion, battery management overhead and cell protection reduce the 10,240 Wh rating to about 8,704 Wh of deliverable AC energy (85% system efficiency). Duty cycle is the share of each hour the load actually draws its running power — thermostats, pressure switches and intermittent use all lower it.
| Duty cycle | Average draw | Runtime (no solar) | Energy per 24 h |
|---|---|---|---|
| 25% | 800 W | 10.9 hrs | 19.2 kWh |
| 50% | 1,600 W | 5.4 hrs | 38.4 kWh |
| 65% | 2,080 W | 4.2 hrs | 49.9 kWh |
| 100% | 3,200 W | 2.7 hrs | 76.8 kWh |
Even at a 50% duty cycle the battery lasts 5.4 hrs, so plan on solar, grid or generator recharging for anything longer than an evening outage.
3. BS 7671 / IEC 60364 Breaker & Cable Sizing
IEC-based codes size protection by design current rather than a blanket 125% multiplier: Ib ≤ In ≤ Iz. At 230 V the load draws 13.9 A, so a 16 A Type B/C MCB with RCD protection applies. In the UK, BS 7671 Section 722 additionally requires a dedicated circuit and Type A or Type B RCD for EV charge points.
| One-way distance | MCB | Min. cable | Voltage drop |
|---|---|---|---|
| 7.5 m (25 ft) | 16 A | 1.5 mm² | 1.10% |
| 15 m (49 ft) | 16 A | 1.5 mm² | 2.20% |
| 22.5 m (74 ft) | 16 A | 2.5 mm² | 2.02% |
| 30 m (98 ft) | 16 A | 2.5 mm² | 2.69% |
Moving the Selectronic SP Pro AU Off-Grid Inverter from 7.5 m to 30 m away forces the conductor up from 1.5 mm² to 2.5 mm² — park the unit as close to the load as ventilation and weather protection allow.
4. Solar Array Recharge Time Breakdown
The Selectronic SP Pro AU Off-Grid Inverter accepts up to 8,000 W of photovoltaic input. Real arrays rarely deliver nameplate output, so we apply an 80% harvest factor for MPPT conversion, cell temperature and soiling, and convert hours to days using 4.5 peak-sun-hours — a conservative annual average for the US, southern Europe and Australia (UK winters can fall below 1.5).
| PV array | Real harvest | 0–100% recharge | Sun-days @ 4.5 PSH | Net with load @ 50% |
|---|---|---|---|---|
| 800 W | 640 W | 16.0 hrs | 3.6 | −960 W |
| 1,600 W | 1,280 W | 8.0 hrs | 1.8 | −320 W |
| 3,000 W | 2,400 W | 4.3 hrs | 0.9 | +800 W |
| 6,000 W | 4,800 W | 2.1 hrs | 0.5 | +3,200 W |
| 8,000 W | 6,400 W | 1.6 hrs | 0.4 | +4,800 W |
A typical 800 W portable array refills the battery in about 16.0 hrs of strong sun, while maxing out the 8,000 W input cuts that to 1.6 hrs. To fully offset the 3-Ton Central Air Conditioner (Standard LRA) at a 50% duty cycle (1,600 W average) during daylight you need roughly 2,000 W of panels, which this unit can accept.
5. Frequently Asked Questions
Can the Selectronic SP Pro AU Off-Grid Inverter run a 3-Ton Central Air Conditioner (Standard LRA)?
Yes. The Selectronic SP Pro AU Off-Grid Inverter delivers 7,500 W continuous and 22,500 W surge, covering the 3-Ton Central Air Conditioner (Standard LRA)'s 3,200 W running and 9,500 W start-up draw at 43% inverter utilization.
How long will the Selectronic SP Pro AU Off-Grid Inverter run a 3-Ton Central Air Conditioner (Standard LRA)?
With 10,240 Wh of capacity and 85% inverter efficiency, expect about 2.7 hrs of continuous operation and 5.4 hrs at a 50% duty cycle. Adding solar input during the day extends this further.
What breaker and wire size do I need to connect a 3-Ton Central Air Conditioner (Standard LRA) to the Selectronic SP Pro AU Off-Grid Inverter?
At 230 V the load draws 13.9 A. Under BS 7671 / IEC 60364 the protective device must be at least the design current (Ib ≤ In ≤ Iz), so use a 16 A MCB with RCD protection on 1.5 mm² copper cable for runs up to 7.5 m (1.1% voltage drop). Connection: Hardwired via DP isolator · IEC 60309 32A.
How long does it take to recharge the Selectronic SP Pro AU Off-Grid Inverter with solar panels?
With an 800 W array and an 80% real-world harvest factor, a full recharge takes about 16.0 hrs of peak sun (3.6 days at 4.5 peak-sun-hours). At its maximum 8,000 W solar input it drops to 1.6 hrs.
Methodology & safety note
Specifications come from manufacturer datasheets in our open dataset; ampacity and resistance values follow NEC Table 310.16 and Chapter 9 Table 8, and BS 7671 Appendix 4. Calculations assume copper conductors, 30 °C ambient and no bundling derating. Inverter-to-panel connections require a listed transfer switch or interlock to prevent back-feeding the grid. These results are an engineering estimate, not a substitute for a licensed electrician and local permit. See our methodology and safety disclaimer.